Equipment Management
PCI has more than 20 years of experience with welding and machining equipment refurbishment and repair services.
Personnel
- 45 E-tech personnel currently working on equipment repairs and refurbishment
- Field E-techs who perform nuclear project site work and perform refurbishment
- Dedicated In-house Senior E-tech Personnel – 100 years combined nuclear E-tech experience
- Dedicated Equipment Manager
- Dedicated Warehouse Manager
Equipment Management of:
- More than 100 Gold Track Power Units
- More than 300 Power Cables
- More than 300 5 Part Leads
- More than 100 Custom Weld Heads
Warehouse & Dedicated Refurbishment Areas
- Approx. XX cubic feet of floor to ceiling warehouse volume
- E-tech refurbishment area
- RCA—Hot Tool Capability—Waltz Mill site
Process & Programs
- Equipment History Tracking Form
- Equipment Inventory Sheets
- Engineering Document Control System—Critical Equipment Configuration Control
- Use of SAP for Equipment & Material—Inventory Management
Equipment Resources include:
- Narrow Groove Welding
- (65) 500 AMP Power Supplies
- (34) Outside Diameter NG Weld Heads
- (24) Inside Diameter NG Weld Heads
- (16) Hi-Dep “Hot Wire” Welding Systems
- Omega CNC Machining Systems
- (18) 24”–72” Omega 9B
- (12) 6”–24” Omega 9A
- (100+) OD / ID Prepping and Cutting Machines
- Metrology Equipment
- (8) Laser Trackers
- (6) Total Station Theodolite
